DAILY Ex - 25 NOVEMBER 2026
TODAY'S FOCUS: When the original design assumptions no longer reflect operational reality. Today's edition focuses on deteriorating hazardous inventories, industrial accident learning, outstanding safety recommendations and the importance of understanding the limits of equipment conformity. The operational question: When was the last time we verified that our original explosion-risk assessment still reflects how the facility operates today?

⚡ DAILY Ex | 25 NOVEMBER 2026
Global Explosion Protection Watch | Head of Operations Edition
TODAY'S FOCUS: When the original design assumptions no longer reflect operational reality.
Today's edition focuses on deteriorating hazardous inventories, industrial accident learning, outstanding safety recommendations and the importance of understanding the limits of equipment conformity.
The operational question: When was the last time we verified that our original explosion-risk assessment still reflects how the facility operates today?
🔴 1. USA | Deteriorating hazardous chemical inventory requires urgent intervention
CURRENT DEVELOPMENT · 24–25 NOVEMBER
The US Army is preparing for the controlled disposal of deteriorated energetic material at its Iowa ammunition facility today, following two postponements.
Public concerns include potential toxic lead contamination, environmental consequences and emergency communication. Authorities consider further deterioration of the stored material a significant safety concern.
Ex distinction: This involves an inherently explosive substance rather than a conventional ATEX explosive atmosphere.
Why it matters operationally: Chemical ageing, storage duration and material degradation can fundamentally change the original risk assessment.
Management action: Review ageing hazardous inventories, expired chemicals, unstable residues and materials awaiting disposal.
https://www.wpr.org/news/what-midwest-residents-need-to-know-about-the-lead-azide-detonations
🔴 2. CHINA | Gas-well blowout and fire during maintenance operations
NEW OFFICIAL INCIDENT REPORT · 24 NOVEMBER
Authorities in Zizhou County, Shaanxi Province, reported a natural-gas well blowout and subsequent fire during pipe-pulling operations on 21 November.
Two workers died, one remains missing and four escaped safely. Emergency response, well-control operations and investigation activities are continuing.
The initiating ignition source has not been established.
Why it matters operationally: Well intervention introduces changing containment boundaries, temporary release sources and hazardous conditions that may differ significantly from normal production.
Management action: Verify temporary hazardous-area arrangements, well-control barriers, ignition-source restrictions and emergency shutdown procedures.
https://www.chinaday.news/archive/2026-11-24/en
🔬 3. RESEARCH | Can protective walls mitigate hydrogen tank rupture consequences?
RECENT SCIENTIFIC PUBLICATION · 15 NOVEMBER
Research published in Process Safety and Environmental Protection examines high-pressure hydrogen tank rupture during fire exposure using coupled computational fluid dynamics and finite element modelling.
The simulations demonstrate that appropriately designed protective barriers can significantly reduce overpressure in shielded areas.
However, the findings remain dependent on the assessed geometry, structural response and accident scenario.
Why it matters operationally: Hydrogen infrastructure requires consequence assessment beyond hazardous-area classification and Ex equipment selection. Pressure-vessel rupture and blast loading introduce additional engineering requirements.
Management action: Verify protective-wall design assumptions, structural resistance, equipment separation and personnel exposure.
https://doi.org/10.1016/j.psep.2026.109753
📅 4. UK | Hazardex Swansea - explosion protection starts before inspection
TODAY'S INDUSTRY EVENT · 25 NOVEMBER
Today's Hazardex conference in Swansea includes several particularly relevant technical presentations:
* C&P Engineering Services: Why hazardous-area defects identified during inspection often originate during design and procurement.
* Wessex Water: Practical implementation of process safety and DSEAR compliance in the water industry.
* HSE: Regulatory priorities covering explosive atmospheres, functional safety and electrical systems.
These are announced presentation topics, not yet conference conclusions.
Why it matters operationally: Inspection should verify the integrity of an installation, not compensate for inadequate engineering, procurement or commissioning.
Management action: Categorise recurring Ex inspection defects according to their lifecycle origin: design, procurement, installation, operation, maintenance or modification.
https://www.hazardex.live/events/swansea
⚖️ 5. USA | When accident recommendations remain unimplemented
RECENT REGULATORY FOLLOW-UP · 19 OCTOBER
The US Chemical Safety Board reported that Yenkin-Majestic/OPC Polymers had not implemented or substantively responded to five safety recommendations arising from its investigation of the fatal April 2021 resin-plant explosion in Columbus, Ohio.
The recommendations were originally issued in November 2023.
Why it matters operationally: Completing an accident investigation does not eliminate the conditions that caused the accident. Corrective-action implementation and effectiveness verification are separate responsibilities.
Management action: Review outstanding incident-investigation recommendations and require documented evidence of implementation and effectiveness.
⚙️ 6. ATEX / IECEx | Replacement components and the limits of repair
STANDARDS AND ENGINEERING PRACTICE
IEC 60079-19 provides the framework for repair, overhaul and reclamation of Ex equipment.
A mechanically interchangeable replacement component is not necessarily equivalent from an explosion-protection perspective.
Bearing clearances, seal materials, winding characteristics, lubrication requirements and thermal behaviour may influence the original protection concept.
Why it matters operationally: Supply-chain difficulties and obsolete spare parts can encourage technically unjustified substitutions.
Management action: Establish a technical approval process for alternative spare parts, distinguishing repair within the applicable protection requirements from modifications requiring further conformity assessment.
References: IEC 60079-19:2025 · https://www.iecex.com/
▶️ OPERATIONAL Ex USE CASE
THE EX i PRESSURE TRANSMITTER - WHEN A LONGER CABLE CHANGES THE PROTECTION CONCEPT
ILLUSTRATIVE SCENARIO · ELECTRICAL EXPLOSION PROTECTION
A chemical plant relocates an intrinsically safe pressure transmitter installed in Zone 1.
The transmitter and associated apparatus remain unchanged. Both have valid Ex certification.
However, the connecting cable is replaced with a significantly longer cable of a different construction.
The instrument operates correctly. The control system receives accurate measurements.
Maintenance considers the installation acceptable.
The Ex concern: The cable contributes capacitance and inductance to the intrinsically safe circuit. Changing its length or construction can invalidate the original system assessment, even though neither certified device has changed.
Relevant technical references include IEC 60079-11, IEC 60079-14 and IEC 60079-25.
Owner: Instrumentation Manager and Ex Responsible Person.
Required evidence: Associated apparatus output parameters, transmitter input parameters, cable capacitance and inductance, applicable combined parameter limitations, gas group, installation conditions and updated intrinsically safe system documentation.
STOP criterion: Do not authorise normal operation until intrinsic safety of the complete modified circuit has been demonstrated.
KPI: 100% of Ex i circuit modifications supported by an updated system verification.
▶️ TODAY'S CRITICAL Ex QUESTION
An Ex i transmitter is relocated using a longer cable. Both the transmitter and associated apparatus remain unchanged. What must be verified?
A. Only the transmitter's Ex certificate.
B. Only the voltage drop.
C. Intrinsic safety of the complete modified circuit. ✅
D. Only electrical continuity.
The intrinsic safety assessment applies to the complete circuit, including its connecting cable and the applicable electrical parameters.
⚡ DAILY Ex | CLOSING THOUGHT
A chemical inventory can become more hazardous through ageing.
A protective wall can be ineffective outside its assessed design conditions.
An inspection can discover a defect that was introduced years earlier during procurement.
An intrinsically safe circuit can lose its demonstrated protection through a simple cable replacement.
Explosion protection is not a permanent property of an installation. It is a condition that must be maintained, verified and documented throughout its operational lifetime.